OEE Improvement

BSM are experts in maximising equipment productivity and we have a uniquely strong track record of successful implementations…..just ask our clients.

We apply the principles of Total Productive Management (TPM) to significantly improve Overall Equipment Effectiveness (OEE) increasing output and/or reducing costs.

The benefits of our approach include:

  • Increased output
  • Reduced cost per unit
  • Avoidance of the need for additional capital equipment to support volume growth
  • Empowerment of shop floor employees
  • Integrated cross-functional approach to equipment performance management.

The following techniques are often used in equipment productivity improvement projects:

  • Single Minute Exchange of Die (SMED)
  • Measurement of Overall Equipment Effectiveness (OEE), Availability, Performance, Quality and
    Losses
  • Using OEE Toolkit to Measure OEE
  • Productivity based Planning
  • Drum Buffer Rope approach to WIP management
  • Corrective Maintenance and Poka Yoke
  • Statistical Process Control
  • Workplace re-design and layout optimisation
  • Kaizen events
  • Self Managed Teams
  • Autonomous Maintenance.

BSM believes in:

  • Using the OEE metric and maintaining improvement objectives for 3 month, 6 month and 12 month timeframes
  • Applying the techniques of Theory of Constraints (TOC) and Just in Time (JIT) to manage the flow of Work in Progress
  • Involving shop floor and support personnel in the detailed design of improved processes.