HOW LEAN IS YOUR LAB?
In the last five years, most large UK Medical Device and Pharmaceutical manufacturers have undertaken 'Lean' type improvement programmes. Significant improvements have been achieved but, in many cases, much more is possible. The question for Laboratory and QA Managers is : "We've done 'Lean' but how lean are we?"

WORKSHOP CONTENT
This workshop is based on BSM's 'Lean Laboratory' simulation exercise and our Lean Library - we have organised our case study material from Lean projects in Medical Device and Pharmaceutical companies into the 29 modules listed below. With the assistance of a consultant, you will select the topics and modules which best meet your needs. Up to six modules can be covered in a one day session.
Implementing
Lean |
Introduction to Lean |
Lean Flow |
Lean Organisation
|
Lean Planning & Scheduling |
Lean Quality |
TPM & OEE |
| Lean Programmes |
Background to Lean |
5S |
Continuous Improvement |
'Pull' & Lean Planning |
FMEA |
OEE |
| Implementing Lean in a single Value Stream |
Lean Principles & Context |
Cellular Manufacturing |
Goal Deployment |
Level Loading |
Line Stop |
SMED |
| |
Waste Elimination |
Flow |
Lean Organisation |
Levelling the Mix |
Poka Yoke |
TPM |
| |
|
Line Balancing |
Lean Admin |
Pacemaker Scheduling |
QFD |
TPM Programmes |
| |
|
Method Study |
Lean Product Development |
Lean Supply |
Total Quality |
|
| |
|
One Piece Flow |
|
|
|
|
| |
|
Standard Work |
|
|
|
|
WHO SHOULD ATTEND
'Lean Lab/Fast Release' is primarily targeted at:
- QA Managers
- Laboratory Managers
- Operations Manager
- Human Resource Managers
- Lean Co-ordinators
- Sigma Black Belts
WORKSHOP OBJECTIVES
Depending on the configuration of the workshop, participants will be able to:
- Make work flow through the release process
- Reduce batch release leadtime
- Identify and eliminate waste
- Balance testing operations
- Implement level loading
- Implement mix levelling
- Manage queues in the laboratory and the office
- Implement 'standard work'
- Improve employee flexibility
- Achieve right first time
- Manage equipment constraints
- Design and implement Lean organisation changes
- Implement 5S.
To enquire about running this workshop in-house, please e-mail Linda Davey at linda.davey@bsm.ie